Small stitches. Bright ideas. Something made by you.
buttonstudios.net / by REALLYBYTE

Welcome to your little creative corner

A button.
A thread.
A bright idea.

Make a small thing. Mend a favourite thing. Put that tin of buttons to good use. Simple ideas, useful guides and original printables for curious hands.

Start with what you own. Add what the project needs.

Original illustration of colourful buttons, thread, fabric, scissors and an embroidery hoop on a craft table
Small supplies. Lots of possibilities.
18 practical guides6 studio tools4 original printable packs

Choose your little beginning

What would you
like to do?

A first repair, a colour experiment or a gift with your handwriting on it. There is room for all three.

The studio bench

Measure a button.
Meet your colours.

Convert button sizes, try a palette, find a small project, estimate a row of buttons and work out a materials budget.

Open the studio →

From the guide shelf

A little more know-how.

Browse all 18 guides →

Original downloads / from £1.99

Print a plan.
Trace a possibility.

Button-art templates, a sewing and stash planner, mending records and an embroidery sampler. A4 and US Letter editions, plus a free three-page sample.

See the printable collections →
Actual project brief worksheet from the Sewing Project & Stash Planner

Find the right little supplies

Buy for the job.

Explore all 28 supply searches →

The ButtonStudios way

Use what you have.
Try one small thing.
Keep what you learn.

For adult craft projects. Keep loose small parts and sharp tools away from young children and pets.

Shopping links are ads. As an Amazon Associate I earn from qualifying purchases. Amazon links open searches; compare the actual listing, dimensions, contents, suitability and seller before buying.